Client:
Murray Irrigation Limited
Dates:
May 2015 to August 2015
Location:
Deninliquin, Finley and Berrigan – MIL Catchment Area
Project Overview:
Installation of Flume Gates and Slip Meters
Major structural concrete works
Retrofitting existing concrete structures
Installation of aluminium walkways and handrails
Quality and survey control to ensure accuracy in water metering
Comments