top of page

8.2KM OF ROAD RECONSTRUCTIONS – PORTARLINGTON

Clent:

City of Greater Geelong


Dates:

November 2016 to December 2017


Location:

Portarlington


Project Overview:

  • Reconstruction of 8.2km of residential road in North-East Portarlington.

  • Excavation and disposal of 18000 cub m of spoil

  • 50+ Pit alterations

  • 120+ crossover culvert with driveable headwalls

  • 16km of swale drains

  • Kerb and channel and concrete driveways

  • Road pavement construction including 20,000 ton class 3 and 20,000 ton class 2 rock

  • 60,000 m2 of spray sealing, and asphalting.


bottom of page