Clent:
City of Greater Geelong
Dates:
November 2016 to December 2017
Location:
Portarlington
Project Overview:
Reconstruction of 8.2km of residential road in North-East Portarlington.
Excavation and disposal of 18000 cub m of spoil
50+ Pit alterations
120+ crossover culvert with driveable headwalls
16km of swale drains
Kerb and channel and concrete driveways
Road pavement construction including 20,000 ton class 3 and 20,000 ton class 2 rock
60,000 m2 of spray sealing, and asphalting.
Comments