- NATIONAL STORAGE - BROOKLYN
Client: National Storage Dates: November 2017 to May 2018 Location: Geelong Road, Brooklyn Project Overview: Demolition of existing storage sheds Removal of existing concrete and asphalt, Earthworks to new levels Construction of concrete factory slabs Stormwater drainage, Fire and Water Services Concrete Roadway pavement, including 6000m2 of 180 thick Concrete. Asphalt carpark including kerb and channel Line marking
- LISIEUX CATHOLIC PRIMARY SCHOOL – ENTRANCE & TURNING LANES
Client: SMEC – for the Roman Catholic Archdiocese of Melbourne Dates: January 2018 to April 2018 Location: South Beach Road, Torquay Project Overview: Construction of an entrance to a new school, Road widening works including turning lane, Construct bus stop, Major road drainage works, pit construction Concrete works including kerb and channel and Shared path Asphalt and Spray Sealing Miscellaneous works including TGSI, Bus stop installation, signage and line marking
- ROAD RECONSTRUCTION PACKAGE – LITTLE RIVER
Client: Wyndham City Council Dates: June 2018 to August 2018 Location: Rothwell Road & Flinders Street, Little River Project Overview: Road reconstruction works Demolition and Excavation of existing road Rebuild pavement with capping material, class 3 and class 2 fine Crushed Rock Drainage works including RCP pipes, New Pits, and Agi Drains Concrete Works including New kerb and channels, and crossovers and footpaths Asphalt and spray sealing Miscellaneous works including Landscaping, new signage installations and line marking
- CONTAINER YARD PAVEMENT REHABILITATION
Client: K& S Freighters Group Dates: September 2018 to October 2018 Location: Boundary Rd, Truganina Project Overview: Excavation of existing container yard pavement Place cemented treated crushed rock Place ag drain in sub grade Place crushed rock base Place Heavy Duty 20SI asphalt and hard-wearing HP overlay Install approx. 120 lin m of drainage to re-connect stormwater down pipes
- ROAD RECONSTRUCTION PACKAGE – TARNEIT
Client: Wyndham City Council Dates: October 2018 to February 2019 Location: Lauderdale Drive and Cromwell Road, Tarneit Project Overview: Road reconstruction works Demolition and Excavation of existing road Rebuild pavement with capping material, class 3 and class 2 fine Crushed Rock Drainage works including RCP pipes, New Pits, and Agi Drains Concrete Works including New kerb and channels, and crossovers and footpaths Asphalt and spray sealing (Fibre Dek) Miscellaneous works including Landscaping, new signage installations and line marking
- KERB AND CHANNEL INSTALLATION – MARSHALL
Client: City of Greater Geelong Dates: November 2018 to January 2019 Location: Three locations along Barwarre Road, Marshall Project Overview: Excavation of existing swales and disposal of spoil Road pavement construction Kerb and channel works Agi drain installation Construction of new stormwater pits Primer sealing and Asphalting
- KARDINIA PARK CONCRETE WORKS
Client: Kardinia Park Stadium Trust Dates: June 2019 Location: Kardinia Park, Geelong Project Overview: Demolition of the existing garden Pour concrete slab – approx. 120m2 Install concrete road barriers as a temporary retaining wall Install colour bond fencing and chain mesh fencing
- ROAD RECONSTRUCTION PACKAGE – HOPPERS CROSSING
Client: Wyndham City Council Dates: May 2019 to Sep 2019 Location: Melaleuca Drive, Hilden Close and Barklya Court – Hoppers Crossing Project Overview: Road reconstruction works Demolition and Excavation of existing road Rebuild pavement with capping material, class 3 and class 2 fine Crushed Rock Drainage works including RCP pipes, New Pits, and Agi Drains Concrete Works including New kerb and channels, and crossovers and footpaths Asphalt and spray sealing (Fibre Dek) Miscellaneous works including Landscaping, new signage installations and line marking
- CENTRAL PARK COMMUNITY CENTRE CARPARK
Client: Wyndham City Council Dates: September 2019 to December 2019 Location: Central Park Community Centre Project Overview: Demolition of the existing car park Rebuild pavement and rock layers Install new drainage pipes and pits Asphalt and spray sealing works Line marking, bollards and wheel stops.
- ROAD REHABILITATION - TORQUAY
Client: Surf Coast Shire Council Dates: February 2020 to March 2020 Location: Fischer Street, Torquay – Between Beach St and Darian Road Project Overview: Profile existing road to 330mm depth Place 100mm Cement Treated Crushed Rock Layer Place two layers of 20mm SI Asphalt and one Layer 10mm Overlay
- RAISED PEDESTRIAN CROSSINGS
Client: Maribyrnong City Council Dates: Somerville Road / Roberts St and Geelong Road, Footscray West Location: April 2020 to May 2020 Project Overview: Demolish and remove existing footpath and kerb and channel. Replace with new kerb and channel to new heights Regulate slip lane to accommodate new levels. Asphalt raised pedestrian crossing. Pour new shared path. Line marking and yellow surface treatment to crossing